Mclean Engineering
- Addresses
- PO BOX 736729, DALLAS, TX 75373
PO Box 2587, Moultrie, GA 317762587written 3 ways in filings
PO Box 2587, Moultrie, GA 317762587
PO BOX 2587, MOULTRIE, GA 31776
POBOX 2587, MOULTRIE, GA 31776
2929 S MAIN STREET, MOULTRIE, GA 31768 - Service
- Joint Use Inspections
- Total reported
- $8,041,492
- Website
- Find website (990s don't list vendor websites; this searches DuckDuckGo)
Who paid them
| Year | Organization | Service | Location | Paid | Filing |
|---|---|---|---|---|---|
| 2025 | BLUEGRASS ENERGY COOPERATIVE CORP | POLE ATTACHMENT ENGINEERING | DALLAS, TX | $2,692,145 | view original ↗ |
| 2025 | OWEN ELECTRIC COOPERATIVE INC | Joint Use Inspections | Moultrie, GA | $554,421 | view original ↗ |
| 2024 | BLUEGRASS ENERGY COOPERATIVE CORP | POLE ATTACHMENT ENGINEERING | DALLAS, TX | $1,522,447 | view original ↗ |
| 2024 | OWEN ELECTRIC COOPERATIVE INC | Joint Use Inspections | Moultrie, GA | $341,439 | view original ↗ |
| 2024 | INTER-COUNTY ENERGY COOPERATIVE CORPORATION | CONTRACT LABOR - POLE ATTACHMENTS | DALLAS, TX | $291,458 | view original ↗ |
| 2023 | BLUEGRASS ENERGY COOPERATIVE CORP | POLE ATTACHMENT ENGINEERING | DALLAS, TX | $608,234 | view original ↗ |
| 2023 | OWEN ELECTRIC COOPERATIVE INC | Joint Use Inspections | Moultrie, GA | $254,366 | view original ↗ |
| 2021 | COLQUITT ELECTRIC MEMBERSHIP CORP | ENGINEERING | MOULTRIE, GA | $219,155 | view original ↗ |
| 2019 | NORTHEAST OKLAHOMA ELECTRIC COOPERATIVE | POLE INVENTORY | MOULTRIE, GA | $641,356 | view original ↗ |
| 2018 | NORTHEAST OKLAHOMA ELECTRIC COOPERATIVE | POLE INVENTORY | MOULTRIE, GA | $681,846 | view original ↗ |
| 2018 | LEA COUNTY ELECTRIC COOPERATIVE INC | SYSTEM ENGINEERING | MOULTRIE, GA | $234,625 | view original ↗ |
Grouped by normalized name; different firms with identical names appear together. Check the addresses.
Comments